quality-assurance

Quality Inspection

Our QC team has rich experience in quality controlling. Before production, our QC engineers will set inspection standards for products. In the process of production, we’ll do spot checking or full inspection with following ISO standards. After production, we’ll fully inspect every part before delivery

We concentrate on every detail of the products. Good quality is the foundation that we live.

  • FQC: Final Quality Control. Check product quality after all process completed.
  • IQC: Incoming Quality Control. Ensure the quality of the purchased materials.
  • QE:Quality Engineers seek to test, control and improve process to improve product quality from prototype quality control to production.
  • IPQC: InPut Process Quality Control. Quality control from production to packing process, adopting circular inspection between every procedure in production for quality testing.
  • OQC: Outgoing Quality Control. It’s a all-side inspection to ensure quality as customer required after parts delivered.

Pre-production technical support

In early stage of cooperation, we’ll provide customers free assessments of projects and improving suggestion(DFM), such as materials, surface requirements, product and tool structures, process technologies, 3D & 2D drawings, and other details, and also assist customers to modify product designing.

Set project control plan:After confirm the finalized drawings and requirements of products, our project engineering team will set production plans according to the overall requirements of projects, including production operation standard, quality inspection standard(material inspection, dimension inspection, appearance inspection, performance testing…etc.) and packing standard, etc.

In Production

Authentic Materials

For all materials, we can provide certifications of material and heat treatment from raw material manufacturers, usually including material heat numbers, material trademarks, material size, mechanical property, chemical analysis, hardness, etc.

In-process quality control

For every project, our professional project engineers are responsible for project schedule, providing customer project schedule and photos every week, and also are responsible for quality together with QC and production departments.

Pre-shipment Inspection

Our quality control system, QC engineers are involved in every step, and data are recorded for tracing in the future. For all projects, we provide customer QC reports for all inspection items, including part quantity, critical dimensions, threads & tolerances, thickness & depth, part appearance, and material property, to ensure all parts 100% qualified delivery.

Packing:To ensure the custom made parts not damaged in logistics process, we provide 5 layers of protection in packing process: 1. Steel components are sprayed with anti-rust painting. 2. Wrapping paper. 3. Pearl cotton. 4. Foam. 5. Packed in boxes or wooden cases. We’d like to make sure that our customers received the most high quality and beautiful parts.